Loading...Utility-scale solar foundation services
Local African mobilisation. International PV experience. Santana Construction Uganda, working in partnership with BayTex East Africa, provides complete test-pile installation, driveability trials, pull-out testing, predrilling, extraction and field reporting for international EPCs, developers and tracker manufacturers.

A pull-out test (POT) campaign verifies how proposed steel foundations behave in actual site conditions before or during utility-scale PV construction. Subject to the client’s approved procedure, our scope can combine the equipment and personnel normally sourced from several subcontractors.
Testing is executed to the client, tracker manufacturer or engineer’s approved procedure. Foundation design or certification is included only when expressly defined in the contracted engineering scope.






POT and pile-load testing provide field data for the tracker supplier, EPC, foundation engineer and geotechnical consultant to assess pile/profile selection, embedment assumptions and construction performance. During each load step, the team records the applied load, holding period and corresponding movement. Pass/fail conclusions are reported only when the client supplies the applicable acceptance criteria.
Trial piles can document depth, driving time, refusal, difficult ground, deformation, installation observations and the suitability of proposed profiles and embedment depths.
Our auger capability supports pilot holes, hard-ground assistance and alternative methods where direct driving encounters refusal.
The extractor kit supports removal of test, rejected or incorrectly installed piles, replacement works and temporary-foundation removal.
Depending on the client’s specification, reports can include test identification and coordinates, pile profile and embedment, ground and driving observations, equipment and calibration references, test direction, load increments, holding periods, displacement readings, maximum and residual displacement, load-displacement graphs, photographs, supplied acceptance criteria and conclusions.
Two African solar construction companies. One experienced management team.
Santana Construction Uganda works in partnership with BayTex East Africa, combining local operational capability with utility-scale PV construction experience developed across multiple African markets. Carles Santana serves as Director and Construction Manager within both organisations, supporting coordinated personnel, equipment, construction management and regional mobilisation.
Projects originally contracted through BayTex are clearly presented as partner experience and are not represented as Santana contracts.
Kibali Mine, DRC: construction-stage POT field execution. Sadiola, Mali: 96 tests across ESET, PVH and FACTUIN foundation systems. BayTex East Africa – Partner Experience.
Shared management and partner experience includes Eldosol & Radiant in Kenya, Bamburi Cement PV projects, Ituka / West Nile in Uganda, Blanket Gold Mine in Zimbabwe and tracker commissioning at Bolobedu in South Africa.
Our operational base is in Uganda, with additional regional capability through BayTex East Africa. We can assess project mobilisation to Uganda, Kenya, Tanzania, Rwanda, Burundi, DRC, Zambia, Zimbabwe, Mozambique, Malawi, Gabon, Mali and other African markets. These are mobilisation territories, not claims of permanent offices.
Local specialist subcontracting aligned with project drawings, test matrices, manufacturer procedures and international HSE expectations.
Early-stage foundation testing, traceable field data and practical installation feedback for engineering review.
PV foundation and construction support for captive-power projects in demanding African environments.
POT means Pull-Out Test. It is a field pile-load test used to measure foundation response to specified uplift and, where required, lateral, compression or inclined loads.
Yes. Subject to scope and site conditions, the same team can install trial piles, perform driveability observations, predrill, test, extract and report.
Yes. Testing is planned against the approved client or manufacturer procedure, pile drawings, test matrix, load steps, holding times and acceptance criteria supplied for the project.
Yes. The reporting format and deliverables are agreed before mobilisation and can include test data, graphs, photographs, equipment records, observations and conclusions.
Yes, subject to equipment logistics, permits, programme and project scope. Send the project location and specification so the team can assess mobilisation.
Send us your POT specification, pile drawings, test matrix and mobilisation requirements. Our construction team will review the equipment, personnel and field scope required.
Servicios de cimentaciones para plantas fotovoltaicas
Movilización local en África. Experiencia fotovoltaica internacional. Santana Construction Uganda, en colaboración con BayTex East Africa, ofrece campañas completas de hincado de pilotes de prueba, ensayos de hincabilidad, POT, perforación previa, extracción e informes de campo para EPC, promotores y fabricantes de seguidores solares.
Los ensayos de arrancamiento y carga de pilotes permiten comprobar el comportamiento de las cimentaciones metálicas propuestas en las condiciones reales del terreno. Según el procedimiento aprobado por el cliente, podemos ejecutar ensayos de tracción vertical, carga lateral, compresión y carga inclinada, registrando cada incremento de carga, el tiempo de mantenimiento y el desplazamiento correspondiente.
Registro de profundidad, tiempo de hincado, rechazo, terreno difícil, deformaciones y observaciones de instalación.
Agujeros piloto y apoyo en terrenos duros cuando el hincado directo encuentra rechazo.
Retirada de pilotes de prueba, rechazados o mal instalados, sustituciones y trabajos correctivos.
Según la especificación, el informe puede incluir identificación y coordenadas, perfil y empotramiento, observaciones del terreno y del hincado, equipos y calibraciones, dirección del ensayo, incrementos de carga, tiempos, desplazamientos, gráficas, registro fotográfico, criterios suministrados por el cliente y conclusiones.
Dos empresas africanas de construcción solar. Un equipo directivo con experiencia.
Santana Construction Uganda trabaja en colaboración con BayTex East Africa. Carles Santana es Director y Construction Manager en ambas organizaciones, facilitando la coordinación de personal, equipos, gestión de obra y movilización regional.
Los proyectos contratados originalmente por BayTex se identifican expresamente como experiencia del socio y no como contratos de Santana.
Nuestra base operativa está en Uganda, con capacidad regional adicional mediante BayTex East Africa. Podemos estudiar la movilización a Uganda, Kenia, Tanzania, Ruanda, Burundi, RDC, Zambia, Zimbabue, Mozambique, Malawi, Gabón y Mali, además de otros mercados africanos. Estos países son zonas potenciales de movilización, no oficinas permanentes.
Significa Pull-Out Test: un ensayo de carga que mide la respuesta del pilote ante tracción y, cuando corresponda, cargas laterales, de compresión o inclinadas.
Sí. Según el alcance y el terreno, un mismo equipo puede hincar, registrar hincabilidad, perforar, ensayar, extraer y preparar el informe.
Sí. La campaña se ejecuta según el procedimiento, planos, matriz, cargas, tiempos y criterios aprobados para el proyecto.
Sí, sujeto a logística, permisos, programa y alcance. Envíenos la ubicación y especificación para evaluar la movilización.
Envíenos el procedimiento POT, planos de pilotes, matriz de ensayos y requisitos de movilización.