Utility-scale solar foundation services

Solar PV Pull-Out Testing & Pile Installation Across Africa

Local African mobilisation. International PV experience. Santana Construction Uganda, working in partnership with BayTex East Africa, provides complete test-pile installation, driveability trials, pull-out testing, predrilling, extraction and field reporting for international EPCs, developers and tracker manufacturers.

Request a POT / Piling QuotationLeer en español

ORTECO hydraulic pile driver installing steel foundations for a utility-scale solar PV project
Mechanised solar PV foundation installation using specialist ORTECO piling equipment.
One mobilisationInstallation, testing and reporting
PV specialistFoundation-to-commissioning experience
Africa-readyRegional equipment and crews

A Complete POT Campaign from One Specialist Team

A pull-out test (POT) campaign verifies how proposed steel foundations behave in actual site conditions before or during utility-scale PV construction. Subject to the client’s approved procedure, our scope can combine the equipment and personnel normally sourced from several subcontractors.

Foundation testing

  • Vertical pull-out / uplift testing
  • Lateral load testing
  • Compression testing
  • Inclined-load testing where specified
  • Load and displacement monitoring

Field execution

  • Test-pile and trial-profile installation
  • Driveability and ramming trials
  • Auger predrilling and pilot holes
  • Pile extraction and remedial works
  • Traceable field records and POT reporting

Testing is executed to the client, tracker manufacturer or engineer’s approved procedure. Foundation design or certification is included only when expressly defined in the contracted engineering scope.

Real Pull-Out Test Field Experience

BayTex East Africa – Partner Experience: Kibali Mine Solar Project, DRC. The photographs below document genuine construction-stage traction, lateral-load and compression test setups using calibrated measuring equipment, controlled load application and displacement monitoring. Confidential readings and proprietary acceptance criteria are not published.

What the Testing Establishes

POT and pile-load testing provide field data for the tracker supplier, EPC, foundation engineer and geotechnical consultant to assess pile/profile selection, embedment assumptions and construction performance. During each load step, the team records the applied load, holding period and corresponding movement. Pass/fail conclusions are reported only when the client supplies the applicable acceptance criteria.

PV Pile Driveability, Predrilling and Extraction

Driveability trials

Trial piles can document depth, driving time, refusal, difficult ground, deformation, installation observations and the suitability of proposed profiles and embedment depths.

Auger predrilling

Our auger capability supports pilot holes, hard-ground assistance and alternative methods where direct driving encounters refusal.

Pile extraction

The extractor kit supports removal of test, rejected or incorrectly installed piles, replacement works and temporary-foundation removal.

One Mobilisation. One Contractor Team.

Review drawings, test matrix and approved procedure
Mobilise equipment, technicians and HSE documentation
Install test piles and record driving observations
Perform driveability trials and predrill where required
Execute uplift, lateral and compression tests
Record load, holding time and displacement
Extract trial piles where required
Compile photographs, graphs and field observations
Issue the agreed technical POT report

Engineering-Ready POT Reporting

Depending on the client’s specification, reports can include test identification and coordinates, pile profile and embedment, ground and driving observations, equipment and calibration references, test direction, load increments, holding periods, displacement readings, maximum and residual displacement, load-displacement graphs, photographs, supplied acceptance criteria and conclusions.

Santana Construction + BayTex East Africa

Two African solar construction companies. One experienced management team.

Santana Construction Uganda works in partnership with BayTex East Africa, combining local operational capability with utility-scale PV construction experience developed across multiple African markets. Carles Santana serves as Director and Construction Manager within both organisations, supporting coordinated personnel, equipment, construction management and regional mobilisation.

Projects originally contracted through BayTex are clearly presented as partner experience and are not represented as Santana contracts.

Selected Utility-Scale PV Experience

Foundation testing

Kibali Mine, DRC: construction-stage POT field execution. Sadiola, Mali: 96 tests across ESET, PVH and FACTUIN foundation systems. BayTex East Africa – Partner Experience.

Solar construction

Shared management and partner experience includes Eldosol & Radiant in Kenya, Bamburi Cement PV projects, Ituka / West Nile in Uganda, Blanket Gold Mine in Zimbabwe and tracker commissioning at Bolobedu in South Africa.

Mobilisation Across Africa

Our operational base is in Uganda, with additional regional capability through BayTex East Africa. We can assess project mobilisation to Uganda, Kenya, Tanzania, Rwanda, Burundi, DRC, Zambia, Zimbabwe, Mozambique, Malawi, Gabon, Mali and other African markets. These are mobilisation territories, not claims of permanent offices.

Specialist Support for International Solar Companies

EPCs & tracker manufacturers

Local specialist subcontracting aligned with project drawings, test matrices, manufacturer procedures and international HSE expectations.

Developers, IPPs & consultants

Early-stage foundation testing, traceable field data and practical installation feedback for engineering review.

Mining & industrial clients

PV foundation and construction support for captive-power projects in demanding African environments.

Information Required for an RFQ

  • Company and project contact
  • Country, location and access information
  • Project capacity and expected mobilisation date
  • Tracker / structure manufacturer
  • Pile profiles and proposed embedment depths
  • Number of test piles and required tests
  • Test directions and maximum/design loads
  • POT procedure and test matrix
  • Pile and foundation drawings
  • Geotechnical report, BOQ/RFQ and KMZ where available

Frequently Asked Questions

What does POT mean in solar construction?

POT means Pull-Out Test. It is a field pile-load test used to measure foundation response to specified uplift and, where required, lateral, compression or inclined loads.

Can you install the test piles and perform the tests?

Yes. Subject to scope and site conditions, the same team can install trial piles, perform driveability observations, predrill, test, extract and report.

Can you follow a tracker manufacturer’s procedure?

Yes. Testing is planned against the approved client or manufacturer procedure, pile drawings, test matrix, load steps, holding times and acceptance criteria supplied for the project.

Do you provide POT reports?

Yes. The reporting format and deliverables are agreed before mobilisation and can include test data, graphs, photographs, equipment records, observations and conclusions.

Can you mobilise outside East Africa?

Yes, subject to equipment logistics, permits, programme and project scope. Send the project location and specification so the team can assess mobilisation.

Planning a PV Project in Africa?

Send us your POT specification, pile drawings, test matrix and mobilisation requirements. Our construction team will review the equipment, personnel and field scope required.

Request a Quotation

Servicios de cimentaciones para plantas fotovoltaicas

Ensayos Pull-Out Test e Hincado de Pilotes Fotovoltaicos en África

Movilización local en África. Experiencia fotovoltaica internacional. Santana Construction Uganda, en colaboración con BayTex East Africa, ofrece campañas completas de hincado de pilotes de prueba, ensayos de hincabilidad, POT, perforación previa, extracción e informes de campo para EPC, promotores y fabricantes de seguidores solares.

Solicitar oferta POT / hincadoRead in English

Campaña POT completa con un único equipo especialista

Los ensayos de arrancamiento y carga de pilotes permiten comprobar el comportamiento de las cimentaciones metálicas propuestas en las condiciones reales del terreno. Según el procedimiento aprobado por el cliente, podemos ejecutar ensayos de tracción vertical, carga lateral, compresión y carga inclinada, registrando cada incremento de carga, el tiempo de mantenimiento y el desplazamiento correspondiente.

Ensayos de cimentaciones

  • Ensayo de arrancamiento / tracción vertical
  • Ensayo de carga lateral
  • Ensayo de compresión
  • Ensayo inclinado cuando se especifique
  • Control de carga y desplazamiento

Ejecución de campo

  • Hincado de pilotes de prueba
  • Pruebas de hincabilidad
  • Perforación previa con barrena
  • Extracción y trabajos correctivos
  • Registros trazables e informe POT

Experiencia real en ensayos POT

BayTex East Africa – Experiencia del socio: proyecto solar de Kibali Mine, RDC. Las fotografías publicadas muestran montajes reales para ensayos de tracción, carga lateral y compresión, con aplicación controlada de carga y medición de desplazamientos. No se publican resultados confidenciales ni criterios de aceptación propietarios.

Hincabilidad, perforación previa y extracción

Pruebas de hincabilidad

Registro de profundidad, tiempo de hincado, rechazo, terreno difícil, deformaciones y observaciones de instalación.

Perforación con barrena

Agujeros piloto y apoyo en terrenos duros cuando el hincado directo encuentra rechazo.

Extracción de pilotes

Retirada de pilotes de prueba, rechazados o mal instalados, sustituciones y trabajos correctivos.

Una movilización. Un contratista. Una campaña completa.

Revisión del procedimiento, planos y matriz
Movilización de equipos y técnicos
Hincado de pilotes de prueba
Ensayos de hincabilidad y predrilling
Ensayos de tracción, lateral y compresión
Registro de carga y desplazamiento
Extracción cuando sea necesaria
Gráficas, fotografías y observaciones
Entrega del informe POT acordado

Informes POT preparados para revisión técnica

Según la especificación, el informe puede incluir identificación y coordenadas, perfil y empotramiento, observaciones del terreno y del hincado, equipos y calibraciones, dirección del ensayo, incrementos de carga, tiempos, desplazamientos, gráficas, registro fotográfico, criterios suministrados por el cliente y conclusiones.

Santana Construction + BayTex East Africa

Dos empresas africanas de construcción solar. Un equipo directivo con experiencia.

Santana Construction Uganda trabaja en colaboración con BayTex East Africa. Carles Santana es Director y Construction Manager en ambas organizaciones, facilitando la coordinación de personal, equipos, gestión de obra y movilización regional.

Los proyectos contratados originalmente por BayTex se identifican expresamente como experiencia del socio y no como contratos de Santana.

Movilización en África

Nuestra base operativa está en Uganda, con capacidad regional adicional mediante BayTex East Africa. Podemos estudiar la movilización a Uganda, Kenia, Tanzania, Ruanda, Burundi, RDC, Zambia, Zimbabue, Mozambique, Malawi, Gabón y Mali, además de otros mercados africanos. Estos países son zonas potenciales de movilización, no oficinas permanentes.

Preguntas frecuentes

¿Qué significa POT en una planta solar?

Significa Pull-Out Test: un ensayo de carga que mide la respuesta del pilote ante tracción y, cuando corresponda, cargas laterales, de compresión o inclinadas.

¿Podéis instalar y ensayar los pilotes?

Sí. Según el alcance y el terreno, un mismo equipo puede hincar, registrar hincabilidad, perforar, ensayar, extraer y preparar el informe.

¿Seguís procedimientos de fabricantes de seguidores?

Sí. La campaña se ejecuta según el procedimiento, planos, matriz, cargas, tiempos y criterios aprobados para el proyecto.

¿Trabajáis fuera de África Oriental?

Sí, sujeto a logística, permisos, programa y alcance. Envíenos la ubicación y especificación para evaluar la movilización.

¿Está planificando una planta fotovoltaica en África?

Envíenos el procedimiento POT, planos de pilotes, matriz de ensayos y requisitos de movilización.

Solicitar una oferta

Services: solar pull-out testing Africa · PV pile testing · solar foundation testing · solar pile load testing · driveability testing · test-pile installation · ORTECO solar piling · auger predrilling · pile extraction · utility-scale solar subcontracting.